Reconstruction of Tartarchay Sol Sahil and Xanarx canals included in Tartarchay hydro junction irrigation system Preparation and design of a feasibility study for the construction of the plant has begun. Reconstruction of canals President Ilham Aliyev’s “Ensuring the efficient use of water resources Implemented in accordance with the Order dated July 27, 2020 “On additional measures to will be held. Sugovushan reservoir located on the river Tartarchay in the territory of Sugovushan village of Tartar region The total volume is 5.86 million cubic meters. Occupying waters from the Tartarchay and Turagaychay rivers previously regulated in the reservoir, the main with a total submersible capacity of 70 cubic meters per second to the main canal, and after 5.2 km of the canal, the sub-penetration capacity of each is 50 and 20 per second cubic meters were supplied to the Main Coast and Left Coast main canals. The Sugovushan reservoir has been occupied for 28 years Tartar, Goranboy, Yevlakh, Barda, Aghdam and Agjabadi districts, in total, 96 There were serious difficulties in water supply of 217 hectares of land. Azerbaijani Army With the liberation of Sugovushan village, the difficulties in water supply of these areas were eliminated will be removed. After completion of design works, Tartarchay Sol Sahil and Xanarkh canals will be reconstructed The construction is expected to be completed in a short time. With the reconstruction of these canals, Tartar, Water supply of about 20,000 hectares of arable land in Goranboy, Yevlakh and Barda regions will be improved. This will help to ensure sustainable planting in the future, to eliminate water shortages, will lead to high productivity in agriculture.